Accessories: Food Delivery Package Installation

Updated by Lectric eBikes

Make your on-the-go food hauls more zippy and secure than ever before with our Large & Small Food Delivery Package!

Install the Platform:

Quick Start Guide can be found here.

  1. Line up the Platform with the existing holes on the Rear Rack or Front Rack.
  2. Using the existing bolts from the rack, insert the bolts with the washer.
  3. Tighten bolts equally until snug.

Assemble & Secure the Insulated Bag:

There should be 12 rods and 8 Corner Connectors; 4 on the bottom & 4 on the top.

  1. Begin by laying out 4 connectors on a flat surface in a square or rectangle. You can use the bag as a guide if needed
  2. Take 4 rods and push them into the bottom of the connectors until the bottom square is built out
    1. Be sure the rod is secure in the connector(s) before continuing
  3. Next, add 4 rods vertically to the built-out square connectors
  4. Then take the remaining connectors and add them on top of the verticle rods
  5. Add the last 4 rods to the top connectors to complete the cube
  6. Place the cube frame inside the Insulated bag
  7. Place the Insulated platform on top of the bottom of the frame
  8. Use the velcro straps on the side to lock the frame into place
  9. Zip up the bag and place it on the Platform
  10. Use the plastic buckles to weave through the platform and then connect the buckle together
  11. Perform a quick pull test to ensure the bag is secure.

If you have any questions, please don't hesitate to contact our support team at contact@lectricebikes.com or (602) 715-0907.


How did we do?


Powered by HelpDocs (opens in a new tab)